University of Rwanda Digital Repository

Hybrid PV/ Hydropower plant generation optimization using Linear Programing. Case Study of Mutobo Hydro power plant

Show simple item record

dc.contributor.author NDAYISHIMIYE, Benie
dc.date.accessioned 2025-09-11T14:30:57Z
dc.date.available 2025-09-11T14:30:57Z
dc.date.issued 2023-12
dc.identifier.uri http://dr.ur.ac.rw/handle/123456789/2460
dc.description Master's Dissertation en_US
dc.description.abstract The optimization of the Hybrid PV/Mutobo-Hydropower plant generation using linear programing is very important in the operation of power plant. The suitable choice of the hybrid system that optimizes its size and costs components are crucial and challenging jobs, funding for the system sanity. In this thesis, the issue is stated as an optimization maximize the cost profitability. The hybrid system design process makes use of the suggested approach. The case study is Mutobo hydropower plant located in Rwanda, northern province. The suggested linear programming's dependable, quicker and offers outstanding, practically optimal solution of the investment costs systems with many renewable energy sources included. The outcomes demonstrated the viability of the hybrid PV and hydropower system and its ability to mitigate the effects of power shortages in distant places during the dry season. en_US
dc.language.iso en en_US
dc.subject Hybrid PV en_US
dc.subject Linear programing en_US
dc.subject Mutobo-Hydropower en_US
dc.title Hybrid PV/ Hydropower plant generation optimization using Linear Programing. Case Study of Mutobo Hydro power plant en_US
dc.type Dissertation en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Browse

My Account